Stock Code: 002723

搜索
Search

at

img RMB

logo
The Case of "Investor Protection · Clear Rules and Knowledge of Risks" —— Nothing can be generalized with rhetoric and rational analysis in order to get the truth
The Case of "Investor Protection · Clear Rules and Knowledge of Risks" —— Nothing can be generalized with rhetoric and rational analysis in order to get the truth
See more information
The Case of "Investor Protection · Clear Rules and Knowledge of Risks" —— Nothing can be generalized with rhetoric and rational analysis in order to get the truth

金莱特

金莱特
金莱特
Check category

News

>
>
>
Guangdong Jinlaite Electric Co., Ltd. completed the annual expansion of 42 million electrical appliances. Environmental protection acceptance (waste water, exhaust gas, noise)

Guangdong Jinlaite Electric Co., Ltd. completed the annual expansion of 42 million electrical appliances. Environmental protection acceptance (waste water, exhaust gas, noise)

  • Categories:Announcement
  • Author:
  • Origin:
  • Time of issue:2019-10-14 10:55
  • Views:

(Summary description)On October 12, 2019, the acceptance team based on the environmental protection acceptance monitoring monitoring report for the completion of the 42 million-unit expansion project of Guangdong Jinlight Electrical Appliances Co., Ltd. (hereinafter referred to as the "project") and compared with the "Interim Measures for Environmental Protection Acceptance of Completed Construction Projects ”, In strict accordance with relevant national laws and regulations, technical specifications / guidelines for environmental protection acceptance of construction projects upon completion, the project's environmental impact assessment report and approval department's approval decision, etc., to inspect the project, inspect and review relevant materials on site, and the acceptance team Suggestions are as follows:

Guangdong Jinlaite Electric Co., Ltd. completed the annual expansion of 42 million electrical appliances. Environmental protection acceptance (waste water, exhaust gas, noise)

(Summary description)On October 12, 2019, the acceptance team based on the environmental protection acceptance monitoring monitoring report for the completion of the 42 million-unit expansion project of Guangdong Jinlight Electrical Appliances Co., Ltd. (hereinafter referred to as the "project") and compared with the "Interim Measures for Environmental Protection Acceptance of Completed Construction Projects ”, In strict accordance with relevant national laws and regulations, technical specifications / guidelines for environmental protection acceptance of construction projects upon completion, the project's environmental impact assessment report and approval department's approval decision, etc., to inspect the project, inspect and review relevant materials on site, and the acceptance team Suggestions are as follows:

  • Categories:Announcement
  • Author:
  • Origin:
  • Time of issue:2019-10-14 10:55
  • Views:
Information
On October 12, 2019, the acceptance team based on the environmental protection acceptance monitoring monitoring report for the completion of the 42 million-unit expansion project of Guangdong Jinlight Electrical Appliances Co., Ltd. (hereinafter referred to as the "project") and compared with the "Interim Measures for Environmental Protection Acceptance of Completed Construction Projects ”, In strict accordance with relevant national laws and regulations, technical specifications / guidelines for environmental protection acceptance of construction projects upon completion, the project's environmental impact assessment report and approval department's approval decision, etc., to inspect the project, inspect and review relevant materials on site, and the acceptance team Suggestions are as follows:
 
I. Basic situation of project construction
 
(I) Construction site, scale and main construction content
 
Guangdong Kinglight Electric Co., Ltd. is currently located at 21 Jintong Road, Tangxia Town, Pengjiang District, Jiangmen City (coordinates: longitude: 113.004584 °, latitude: 22.669730 °).
 
The project covers a total area of ​​17,7873.8 square meters, with a total construction area of ​​13,5980.8 square meters. This project will expand the construction of 42 million electrical appliances annually. The main equipment includes 5 horizontal plug-in machines, 48 ​​robots, 26 lifting equipment, 3 SMT placement machines, 3120 molds, 5 vacuum coating machines, 12 CNC lathes, 17 winding machines, 10 Vertical taping machine, 4 horizontal taping machines, 10 edge removers, 5 punches, 2 deep hole machines, 1 radial drilling machine, 10 air compressors, 30 ICT testing machines, 3 Blister.
 
(II) Construction process and environmental protection approval
 
The project entrusted Guangzhou Environmental Protection Engineering Design Institute Co., Ltd. to complete the preparation of the EIA report in July 2019, and obtained the "Environmental Impact Report of Guangdong Jinlaite Electric Co., Ltd.'s Expansion of 42 Million Electric Appliances on December 30, 2015" Approval of the Form ", the approval number is Jiang Peng Huan Shen [2019] No. 85. The company started construction on August 21, 2019, and completed on September 10, 2019.
 
(3) Investment
 
The actual total investment of the project is 30 million yuan, and the environmental protection investment is 1.75 million yuan, accounting for 5.83% of the total investment.
 
(IV) Acceptance scope
 
The project and its supporting water, gas and noise environmental protection facilities.
 
 
 
Project changes
 
Through a comprehensive inspection of the project ’s geographic location, floor plan, product output, raw and auxiliary materials usage, production facilities, production processes, and pollutant control measures, Guangdong Jinleite Electric Co., Ltd. ’s annual expansion of 42 million electrical appliances has not changed. Not a major change.
 
Construction of environmental protection facilities
 
(I) Wastewater
 
The project does not produce domestic sewage and production wastewater.
 
(Two) exhaust gas
 
After the solder waste gas is collected and processed by UV photolysis + spray tower equipment, it is led to a 20-meter exhaust cylinder for discharge. After the tin-leaching waste gas is collected and processed by UV photolysis + spray tower equipment, it is led to a 20-meter exhaust cylinder for discharge. Screen printing and drying process After the waste gas is collected, it is processed by UV photolysis + activated carbon adsorption device and then discharged to a 20-meter discharge cylinder. After the mold manufacturing waste gas is collected and processed by UV photolysis + spray tower equipment, it is led to a 20-meter exhaust cylinder for discharge. After collecting waste gas immersed in insulating oil, it is treated by UV photolysis + activated carbon adsorption device and then led to a 20-meter exhaust cylinder. After injection molding waste gas is collected and processed by UV photolysis + activated carbon adsorption device, it is led to a 20-meter exhaust tube. Emissions: After the crushed exhaust gas is collected, it is processed by a cyclone dust collector + spray tower + demister + UV photolysis equipment, and then led to a 15-meter exhaust cylinder for discharge. After the vacuum coating exhaust gas is collected, it is discharged to a 20-meter exhaust cylinder after being processed by the oil fume purifier + spray tower equipment processing equipment.
 
(Three) noise
 
The project mainly deals with the noise generated during the operation of machinery and equipment. It has been dealt with through vibration damping, sound absorption and other methods of the equipment. At the same time, employees are required to strictly implement operating procedures and strengthen the maintenance and maintenance of production equipment to reduce the impact of machinery. Increased noise due to wear.
 
4. Publicity period
 
October 14, 2019-November 8, 2019
 
V. Main Matters for Soliciting Public Opinion
 
This publicity mainly seeks the public's ideas and suggestions for the environmental protection work after the project is completed, understands the impact of the project on all parties in the society and the public's true attitudes and ideas, and effectively protects the interests of the affected people by understanding the opinions of the public.
 
6. Main ways of public comments
 
After this information is publicized, the public can express their opinions on the construction and acceptance of the project by sending e-mail, telephone, letter or interview to the designated address.
 
Seven, feedback method
 
Guangdong Kinglight Electric Co., Ltd.
 
Phone / Fax: Tan Kaiwen 13500288865
 
Mailing address: No. 21, Jintong Road, Tangxia Town, Pengjiang District, Jiangmen City
 
annex:
 
Environmental Protection Acceptance Report for Guangdong Kinglight Electrical Appliances Co., Ltd.
 
Acceptance test report
 
Accept opinion

Address: No.21, Jintong Road, Tangxia Town, Pengjiang district, Jiangmen City Tel: 0750-7173000

 

Copyright © kennede electronics mfg Co., Ltd 粤ICP备11054496号 Powered by 300.cn Manager